Retail corridor player rollout
Dual-4K players running 7×24 behind storefront screens, with no one on site to recover a hung unit.
- Challenge
- Two 4K panels per player, continuous playback and a recovery path that does not need a site visit.
- Result
- NUC-class board with watchdog, remote reboot and a custom boot splash on every unit.
GEOLiNK / Shenzhen